
The D-shaped space behind the endzones are incomplete. They obviously need 300 tons of asphalt to prepare for the next step. The most urgent aspect is the outer curb (being poured Saturday 8/11) with fence posts. We need $16,000 for fencing. We are working diligently to install a concrete sidewalk from the ticket booths to the bleachers. This sidewalk will make access for spectators much safer and cleaner. The concrete pad you see being poured in this picture is a performance pad for the Quarterback Club TriTip BBQ and the Clerk of the Course for track meets. You can see we've taken down the old scoreboard and flagpole. We will not have a flagpole installed for the first game, but hope to install it soon thereafter.